Question 31
A client hired an ICT distribution designer who is designing some additional capacity for a customer owned aerial outside plant. Which of the following would be a PRIMARY consideration?
- Clearances will still be adequate with the added equipment.
- That all of the poles on the path are at least Class 3.
- Sufficient space exists to install additional guying if required.
- Utility coordination with public utilities verifies minimum inductive interference.