Question 26
What is the recommended MINIMUM setback for dirt (spoil) piles from the edge of an excavation (trench, pit, etc.)?
305 mm (12 in)
457 mm (18 in)
610 mm (24 in)
1 m (39 in)
1.20 m (42 in)
Question 27
An Ethernet passive optical network (EPON) uses an aggregation device called an optical line terminal (OLT). An OLT can support a MINIMUM of ______ subscribers per port using a passive optical splitter.
8
16
32
64
Question 28
In addition to providing for current occupant needs, the horizontal pathway system design shall allow for future growth of ___% unless otherwise specified by the client.
20
40
50
100
Question 29
Which of the following may be reviewed by an ICT distribution designer during procurement management?
Existing technology systems
Purchase order and packing slips/invoices and compare to approved submittal
Time frames
Anticipated growth and new technologies
Question 30
An RFQ usually provides more detail than RFP in selecting material such as