Question 11
Placement of a buried OSP pathway in public Rights of Way may require a permit based on which of the following?
Locating of other utilities
Bonding and grounding of metallic conductors
Fees calculated on distance
Building entrance conduit plugging
Question 12
What is the FIRST step in quality evolution (focused on physical quality) when developing a quality plan?
Qualitative risk analysis
Client satisfaction
Conformance
Client value
Quantitative risk analysis
Question 13
Identify the fibers below as either single mode (SM) or multi mode (MM) by dragging the appropriate term into each oval.
Question 14
What’s the RECOMMENDED twisted pair cable slack length to be left at the work area outlet location to enable the possibility of future changes in the Horizontal Cabling System?
≈ 0.152 m (0.5 ft)
≈ 0.3 m (1 ft)
≈ 1 m (3 ft)
≈ 5 m (16.40 ft)
Question 15
During bidding the ICT distribution designer should review the bid responses for compliance and completeness. Afterwards, the designer should report the findings and recommendations to the _______