Question 31

A company produces paints and assembles bicycle frames. You must account for paint drying time before assembly operations can begin. You need to set up the operation to encompass queue times. Which two options can you use? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.

  1. Build capabilities for each resource related to color.
  2. Enter a value in the queue time after field for the painting operation.
  3. Enter a value in the transit time on the painting operation.
  4. Make a resource group for each size and color and assign that group to the operation.
  5. Enter a value in the queue time before field for the assembly operation.

Question 32

A company plans to account for indirect costs related to materials used to manufacture products. The items used to manufacture products have surcharge rates that depend on the type of product being used. You need to set up the costing sheet to include surcharges for specific items. Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Question 33

A manufacturing company is implementing Dynamics 365 Supply Chain Management. Bill of materials (BOMs) must be calculated using standard cost principles. Miscellaneous charges must be included in the unit cost price. The explosion mode must always be enforced as single level. You need to configure the system to meet the requirements. Which configuration should you enable for each requirement? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point.

Question 34

A company produces pipe at certain fixed lengths. The company must be able to schedule cutting machines. You set up the cutting machines as resources. All cutting resources can produce many of the products. There are some products that cutting machines that can produce longer lengths of product. Only some of the machines can do this. You need to configure the resources to account for these different products. What should you do?

  1. Build capability related to length and assign to the appropriate resources.
  2. Configure the Data/Hour option on the Capacity unit field on the resource.
  3. Create a resource for each length.
  4. Create a resource group for each length.

Question 35

A manufacturer uses Dynamics 365 Supply Chain Management to create bicycle parts as a configure-to-order configuration. All bicycle parts are sourced from external sources and assembled in the manufacturing facility. The manufacturer plans to expand its capabilities to create custom bicycles parts in an engineer-to-order model. All bicycle parts will be created in the manufacturing facility. The custom bicycle parts must be omitted from any master planning process. You need to describe the concepts for the requirements. Which concepts should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.