Question 6
What is a prerequisite for installing the TPM after replacing the system board in a PowerScale F900?
Verify the compatibility of the old TPM with the new system board.
Keep the old TPM installed on the new system board.
Ensure that a new TPM is available for installation.
Question 7
Refer to the exhibit.A platform engineer has connected power cables to a Dell PowerScale Gen6 node.What does the status indicator indicate?
On and charging
Mismatch of voltage or component firmware
Standby and redundant
On and healthy
Question 8
A platform engineer is building a new Dell PowerScale cluster. The Configuration Wizard prompts for a cluster name.What is a consideration when entering the cluster name?
Must include a number and special character
Must include the Dell specific site ID
Must include the node 1 serial number
Must be unique to the network
Question 9
Refer to the exhibit.An engineer replaces the drive in C1. They run the isi devices drive list command and obtain the output that is shown.What action must the engineer take?