D-PSC-MN-01

D-PSC-MN-01 practice questions, page 2 of 2, with answer review and explanations.

Question 6

What is a prerequisite for installing the TPM after replacing the system board in a PowerScale F900?

  1. Verify the compatibility of the old TPM with the new system board.
  2. Keep the old TPM installed on the new system board.
  3. Ensure that a new TPM is available for installation.

Question 7

Refer to the exhibit.A platform engineer has connected power cables to a Dell PowerScale Gen6 node.What does the status indicator indicate?

  1. On and charging
  2. Mismatch of voltage or component firmware
  3. Standby and redundant
  4. On and healthy

Question 8

A platform engineer is building a new Dell PowerScale cluster. The Configuration Wizard prompts for a cluster name.What is a consideration when entering the cluster name?

  1. Must include a number and special character
  2. Must include the Dell specific site ID
  3. Must include the node 1 serial number
  4. Must be unique to the network

Question 9

Refer to the exhibit.An engineer replaces the drive in C1. They run the isi devices drive list command and obtain the output that is shown.What action must the engineer take?

  1. Run the isi devices drive add C1 command.
  2. Run the isi devices drive format C1 command.
  3. Update the firmware.
  4. Contact Dell support.