Question 1
An engineer is unable to complete an upgrade due to an insufficient maintenance window.What action should the engineer take?
- Cancel the upgrade and start again when a longer maintenance window is established.
- Complete using a parallel upgrade of the remaining nodes.
- Restore the cluster from the backup.
- Pause the upgrade and resume once a new maintenance window is established.
Question 2
What should be done with the packaging material after unpacking the hardware?
- Leave it in the data center near the hardware.
- Repack it and return it to Dell.
- Dispose of it in its entirety.
- Separate packing materials by type and recycle at local facilities.
Question 3
What is the recommended minimum ambient temperature to operate a Dell PowerScale Gen 6 node?
- 10 °C (50 degrees °F)
- 5 °C (41 degrees °F)
- 0 °C (32 degrees °F)
- 15 °C (59 degrees °F)
Question 4
Which nodes require a minimum of three nodes to form a cluster?
- F800
- F600
- H700
- H600
Question 5
What does a blue handle indicate on Dell PowerScale Gen6 hardware?
- The node should be shut down for maintenance procedures.
- The node can remain online during maintenance procedures.
- The CRU must be replaced.
- The hard drive or SSD must be replaced.