PSP

Review 277 PSP practice questions with answer explanations and community insights.

Question 1

Optimization of risk management techniques that remove the security problem by eliminating the risk is known as risk:

  1. avoidance.
  2. transfer.
  3. reduction.
  4. analysis.

Question 2

A contractor that has installed a physical protection system should be required to repair, correct, or replace any defect for a minimum of:

  1. 3 months.
  2. 6 months.
  3. 12 months.
  4. 24 months.

Question 3

During a security survey, the largest portion of field work involves:

  1. evaluating or drawing conclusions.
  2. analyzing hidden qualities, causes, or effects.
  3. verifying accuracy or validity of data collected.
  4. gathering data and accumulating evidence.

Question 4

A project management team wants to use the best recognized way of understanding the true costs of a security system bid. Their best choice from the following list of methods is:

  1. operating cost.
  2. procurement cost.
  3. installation cost.
  4. life-cycle cost.

Question 5

Reviewing qualifications, checking references, and interviewing staff are all examples of what bid practice?

  1. Staffing plan analysis
  2. Contract award
  3. Vendor selection
  4. Pre-bid conference
We are moving to a new platform

CertificationTest is being migrated. Some pages may be slow or briefly unavailable; everything will be back to normal within a few hours. If you run into any issue, email support@certificationtest.net.