Question 31
Which of these items contribute to what is necessary for successful Kaizen events?
Analysis tools
Management support
Operator support
All of these answers are correct
Question 32
Kanban establishes a means of monitoring production, conveyance and delivery information such that efficient flow is established. The method used by Kanban is to require a _________ before anything moves.
Sign-off
Signal
Bell to ring
Work order
Question 33
When a Belt decides to use written procedures and visual controls to improve the consistency of the tasks that must occur in the process he is improving he has utilized the _________________ activity of 5S.
Sustaining
Sorting
Standardizing
Straightening
Question 34
SPC Charts are used extensively in different business and decision-making environments. In this example a vendor is being selected based on speed of delivery. Which of the conclusions would help you pick a vendor for your needs regarding lead-time of delivery from your vendors? (Note: There are 4 correct answers).
Vendor A with a much shorter lead time in delivery
Vendor B as it has a better consistency (lower variance) on lead time
Vendor B as Vendor A shows a situation out of control as shown in red
Vendor B as the Control Limits are much narrower than Vendor A
Vendor B with higher lead time, but a process with much narrower Control Limits
Question 35
Fractional Factorial designs are used to reduce the ____________ because the number of runs has been lowered.