Question 16
What unit is green power purchased in?
Kilowatt-hour (kWh)
British thermal units (BTUs)
Dollar amount of the purchase price
Megawatt-hour per square foot (MWh/sf)
Question 17
Which of the following strategies meets energy demand with renewable energy?
Installing a solar hot water heater
Incinerating waste to heat a home
Implementing a composting program in an office break room
Purchasing Renewable Energy Certificates (RECs) from a clean coal plant
Question 18
The project team is conducting a feasibility study of a building project. The developer has pre-qualified four potential sites that are all financially viable. Within the context of LEED, which site is the most applicable?
A brownfield site with no access to metro
A brownfield site in a national park with car access only
A greenfield site with access to public transport and proximity to grocery stores
A brownfield site with access to five lines of public transportation and basic services
Question 19
Which of the following strategies prioritizes cost-effectiveness when designing a LEED project?
Onsite renewable systems
Enhanced Commissioning (Cx)
Measuring and verifying systems performance for one year
Applying an integrative design process
Question 20
Which of the following is a minimum program requirement for the LEED for New Construction and Major Renovations Rating System?
Comply with minimum project size
Include temporary structures in floor area calculations
Define a site boundary for the sole purpose of complying with credits
Comply with the best practices of the International Organization for Standardization (ISO)