Question 11
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.
- True
- False
Question 12
The data on SPC charts are typically constructed such that they have the most recent data point on the right hand side.
- True
- False
Question 13
Which statement(s) describe an undesirable situation when implementing SPC?
- The lower Control Limit for the R chart is equal to zero
- Attempt to use SPC for tracking transaction times at a warehouse
- A process is in Statistical Control before implementation of SPC
- The Control Limits are wider than the customer specification limits
Question 14
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
- Individual—Moving Range
- Xbar-R Charts
- Xbar-S Charts
- nP and P Charts
Question 15
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?
- Moving Average Chart
- Multi-Vari Chart
- X bar Chart
- Pareto Chart