CSSGB practice questions, page 4 of 6, with answer review and explanations.
Question 16
A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?
Never, a Control Plan is a living document
As soon as the Champion signs off
Within 30 days of the LSS project review team meeting
After the project has been presented at the recognition event
Question 17
When analyzing a data set we frequently graph one metric as a function of another. If the slope of the Correlation line is -2.5 we would say the two metrics are ___________ correlated?
Positively
Not
Negatively
None
Question 18
Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).
Non-linear relationships between the inputs X’s and output Y
Uncertainty in the slope of the linear relationship between an X and a Y
Relationships between Y (output) and more than one X (Input)
Preventing the use of a Designed Experiment if unnecessary
We assume that the X’s are independent of each other
Question 19
Fractional Factorial designs for an experimental approach are used when ____________ about the multiple metric interaction in a process.
Much is known
Little is known
We don’t care
Data exists
Question 20
A Belt will occasionally do a quick experiment referred to as an OFAT which stands for ____________________.