Question 61
What must be configured to allow SNMP traffic on the APIC controller?
out-of-band management interface
contract under tenant mgmt
SNMP relay policy
out-of-band bridge domain
Question 62
Which type of port is used for in-band management within ACI fabric?
spine switch port
APIC console port
leaf access port
management port
Question 63
Refer to the exhibit. A client reports that the ACI domain connectivity to the fiber channel storage is experiencing a B2B credit oversubscription. The environment has a SYSLOG server for state collection messages. Which value should be chosen to clear the critical fault?
300
410
350
510
Question 64
Which statement about ACI syslog is true?
Notifications for different scopes of syslog objects can be sent only to one destination.
Syslog messages are sent to the destination through the spine.
All syslog messages are sent to the destination through APIC.
Switches send syslog messages directly to the destinations.
Question 65
A data center administrator is upgrading an ACI fabric. There are 3 APIC controllers in the fabric and all the servers are dual-homed to pairs of leaf switches configured in VPC mode. How should the fabric be upgraded to minimize possible traffic impact during the upgrade?
1. Create two maintenance groups for the APIC controllers: VPC left and VPC right. 2. Upgrade the first group of controllers. 3. Upgrade the second group of controllers. 4. Upgrade the leaf switches.
1. Create two maintenance groups for APIC controllers: VPC left and VPC right. 2. Upgrade the leaf switches. 3. Upgrade the first group of controllers. 4. Upgrade the second group of controllers.
1. Create two maintenance groups for the leaf switches: VPC left and VPC right. 2. Upgrade the APIC controllers. 3. Upgrade the first group of leaf switches. 4. Upgrade the second group of leaf switches.
1. Create two maintenance groups for the leaf switches: VPC left and VPC right. 2. Upgrade the first group of switches. 3. Upgrade the second group of switches. 4. Upgrade the APIC controllers.