250-513 practice questions, page 7 of 12, with answer review and explanations.
Question 31
You want to shrink the volume named payvol to 20 MB and resize the VxFS file system automatically. The volume is in the disk group named hrdg. The volume must be resized on the defined disk group. What should you do?
Use vxassist to shrink the volume first, and then shrink the file system.
Use vxassist to shrink the file system first, and then shrink the volume.
Use vxresize to shrink the file system first, and then shrink the volume.
Use vxresize to resize the volume containing the filesystem.
Question 32
Identify the sequence in which VxVM performs a relayout on a "target" volume. 1. An extent of the target volume is restructured. 2. Data stored in an extent of the target volume is moved to the scratchpad volume. 3. A temporary subdisk is allocated to stage data in the volume undergoing relayout. 4. Data stored in the scratchpad volume is moved to an extent of the target volume.
4,3,1,2
3,2,1,4
1,2,3,4
2,4,1,3
Question 33
Which two operating systems are supported for Symantec Data Loss Prevention 12 servers? (Select two.)
Windows 2003 Enterprise Edition 64-bit
Red Hat Linux 5 Enterprise 64-bit
Windows 2008 Server 32-bit
Red Hat Linux 6 Enterprise 64-bit
Windows 2008 R2 Enterprise Edition 64-bit
Question 34
You administer storage for an application "myapp" on server QA1, with a file system dedicated to code and configuration data for that myapp. Part of the testing discipline is to return myapp's file system to a known initial state prior to each test activity, and to run a series of tests beginning with the same initial state. The traditional approach to preparing for each test involves restoring the file system from a backup image prior to each test, which imposes an hour's delay between the end of one test run and the beginning of the next. A typical testing session lasts only two to three hours, the hour of restore delay between tests reduces the availability of the server for testing by about 30%. What kind of Storage Foundation mechanism would work best to reduce the delay required between tests?
Third-mirror breakoff snapshots are the best fit.
Space-optimized instant snapshots are the best fit.
File system snapshots are the best fit.
Storage checkpoints are the best fit.
Question 35
Which is the correct installation sequence?
Enforce > Oracle > detection server > Solution pack
Oracle > Enforce > Solution pack > detection server
Oracle > Enforce > detection server > Solution pack
Enforce > Oracle > Solution pack > detection server